Central Operation Control Center in Baku Metro, Azerbaijan

In 2013, the Central Operations Control Center was established in Baku Metro. RTS company together with LOT Group supplied and installed all necessary equipment for connection with OCC.

The following set of equipment was supplied:

  • interlocking operator server cabinet
  • video server cabinet
  • train driver’s workstation
  • structural element of the information display system, size of the display wall: 1×12 meters.

Modernization and integration of train automation and remote control equipment with new OCC was carried out at 14 stations of Baku Metro. All works at Memar Ajami, January 20, Inshaatchilar, Elmlar Akademiyasy, Nizami, Jafar Jabbarli, Khatai, May 28, Ganjlik, Nariman Narimanov, Ulduz, Gara Garayev, Neftchilar, Akhmedli, Hazi Aslanov stations were performed fully ahead of schedule.